SUPPLYING COOLING WATER FROM THE MARMARA SEA AT AKSA PLANT IN TURKEY

The Scope of the work is to increase the production of the AKSA Acrylic Chemical Industry Factory.

Description:
A new water intake system was designed to reduce the initial temperature of the cooling water from the sea. A new pipeline is designed to take water from a deeper sea bottom. Also a new filtration system and pumping facility designed to increase the efficiency. 620 m of DN1600mm HDPE pipeline was constructed on shore through the sea and sunk as one piece from shore to offshore (deepest sea level of 27 m). The water pool is 8 meters long with a depth of 4 meters. The pump chambers have filters of 4x8x4 m in them. Both are constructed as caissons on the shore . The contract is on the Design & Build Project basis (Similar to FIDIC Yellow Book, Plant & Design-Build)
 

 

 

 