EUROPEAN REGION SEVENTH DISPERSION DRINKING WATER NETWORK CONSTRUCTION: ACTIVATION OF SPARE WATER OF THE OMERLİ DAM IN İSTANBUL FOR EMERGENCY CASES

ISKI (The Istanbul Water and Sanitation Administration) requested the activation of the dam’s spare water to be used in cases of draught, and our company was given the contract on 17.10.2007. A floating pump station was built and HDPE composite pipes with DN 1200 mm were immersed into the dam lake.

Description & Services Provided:
▪ Design and as built drawings,
▪ Installation of the pump collector and the dam lid collector.
▪ The connection of collectors to the 3 immersed PN 10 HDPE pipelines with DN1200 mm.
▪ The connection of 12 flexible pipes with DN 450 mm to the pumping station placed on a pontoon and also to the immersed collector.

Cost of project at completion:
2.1 Million TL
 

 

 

 